MIL-T-60916C (MI)
TABLE IV. Samp ling plan III.
4.7 Classification of defects.
Each sample shall be tested for defects
as specified in 4.7.1 and 4.7.2.
4.7.1 Integral bulkhead motor tube, 2.75 inch FFAR prior to painting
(see drawing 1569403 and table V).
8
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business