MIL-T-60916C(MI)
4 .4.1 First article sample.
Submission. The contractor shall submit a first article sample
4.4.1.1
to a Government approved facility as specified in the contract for evaluation
The first article sample shall
in accordance with the provisions of 4.6.1.
consist of 30 tubes after painting, 30 tubes before painting and one chemical
film treated test panel which have been produced by the contractor or
furnished by a supplier and which have been produced by the contractor
production processes, procedures and equipment which will be used in
fulfilling the contract. All parts and materials including packaging and
packing, shall be obtained from the same source of supply as will be used in
regular production. Prior to submission, the contractor shall inspect the
sample to the degree necessary to assure that it conforms to the requirements
of the contract and submit as specified in the contract or order (see 6.2), a
record of this inspection with the sample, including statements of findings,
certificates of conformance for materials. A first article sample, or portion
thereof, as directed by the contracting officer, shall also be submitted
whenever there is a lapse in production for a period no greater than 90 days
or whenever a change occurs in manufacturing, material used, drawing or
specification such as to significantly affect product uniformity as determined
by the Government.
4.5 Quality conformance ins pection. Quality conformance inspections
shall be as specified in the applicable drawings, as specified herein, and as
specified by the contracting officer (see 6.2) .
Quality conformance inspe ct ion
TABLE I.
4.6
Inspection provisions for production.
4.6.1 Submission of product. At the time each completed lot of items
deliverable under the contract is submitted to the Government for acceptance,
the contractor shall supply as specified in the contract or order (see 6.2),
the following information accompanied by a certificate which attests that the
information provided is correct and applicable to the product being submitted:
A statement that the lot complies with all of the quality assurance
a.
provisions specified in this specification.
5
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business